A burgundy cuffless beanie with a cream tea cup graphic knitted in, wrapping from the front round to the side, with the client’s small label on the cup.
A lifestyle beanie with a sense of humour: an oversized tea cup and saucer in cream wraps from the front of a burgundy cuffless beanie round to the side, with the client’s small label knitted onto the cup.
Our Solution
The beanie is flat-knitted in 100% acrylic on 14-gauge machines. The fine gauge holds the outline of the cup, the saucer and the tiny label in a two-colour jacquard, and the graphic is placed off-centre so it wraps naturally around the head.
Detailed Result
The finished beanie is a playful, recognisable piece in a rich burgundy, with the graphic reading clearly from the front and the side.
Project Specifications
Client / Brand
A lifestyle brand
Product Type
Cuffless Jacquard Beanie
Quantity
1,000 pcs
Fabric
100% acrylic
Decoration
Jacquard Knit
Destination
International
Lead Time
14 days (standard)
Colours
Burgundy, cream
Knit
Flat knit, 14 gauge
Style
Cuffless
Graphic
Tea cup and saucer with the client’s label, knitted in (jacquard)
Standard production lead time is approximately 14 days. Actual lead time may vary depending on product type, order quantity, customization, material availability, sampling/approval requirements and the nature of the project. The confirmed production schedule will be agreed with the customer for each order. On request, 7 days is possible; complex products or very large orders (100,000–200,000 pcs) can take up to one month.
Planning a similar project?
Share your design, quantity, fabric and branding requirements. Our team will review the project and guide you with production options.
Yes. Send us your artwork and we turn it into a knit chart, usually in two or three colours, and confirm it on the sample before production.
Can we choose our own colours?
Yes. The base and the graphic can be knitted in your own colours, matched as closely as the yarn allows.
How long does production take?
Standard production lead time is approximately 14 days. Actual lead time may vary depending on product type, order quantity, customization, material availability, sampling/approval requirements and the nature of the project. The confirmed production schedule will be agreed with the customer for each order.
Start an Enquiry
Have a similar project in mind?
Share your design, quantity, fabric and branding requirements. Our team will review the project and guide you with production options.
Quantity From 50 pcs per design.
Customization Fabric, colours, logo, labels, packaging: tell us what to change.
Your details Send the request and we reply with a quotation.